Amendment C123: Coburg Activity Centre Zone

About Amendment C123 and the Coburg Activity Centre Zone

Amendment C123 implements the land use and built form directions from the Central Coburg 2020 Structure Plan (2006) and Colours of Coburg Place Framework and Strategies (2010), the community framework of The Coburg Initiative, and Pentridge precinct masterplans. The amendment consolidates the planning controls that apply to the Coburg Principal Activity Centre. 

Download the Amendment C123 Information Sheet (DOC 2Mb) or Amendment C123 Information Sheet (PDF 1Mb).

Significant features of the amendment include:

  • Changes to the Local Planning Policy Framework to update references to the Coburg Activity Centre
  • Introduction of a new Activity Centre Zone (ACZ) and schedule that will prescribe appropriate uses and built form controls
  • Preferred maximum building, street wall height controls and setback requirements
  • A mixture of uses, with an emphasis on retailing, offices, and higher-density living
  • Provision of new roads, pedestrian links and key public spaces, and 
  • Overshadowing standards (minimum sunlight provision) to key public spaces.

The land affected by the amendment applies to most land within the Coburg Activity Centre, the boundary of which is defined in the Central Coburg 2020 Structure Plan (2006) and The Coburg Initiative, including the former Pentridge Prison precinct.

In addition the amendment introduced a new Parking Overlay to all land in a Mixed Use Zone, Residential Growth Zone, Commercial Zones and Activity Centre Zone.  Column B parking rates now apply to all developments in activity centres (including neighbourhood centres).

The amendment also transfers Responsible Authority status for all land within the former Pentridge Prison back to Council.

The amendment also rectifies various anomalies in the Moreland Planning Scheme relating to:

  • Clause 22.01 Neighbourhood Character - update to reflect changes made as a result of Amendment C153 - New Residential Zones.
  • Clause 22.06 Heritage - an incorrect reference to the Municipal Strategic Statement has been removed.

Watch the Our Neighbourhood video to learn more about proposed changes to Moreland Planning Scheme.

Status update (15 October 2015)

On 25 September 2015 the Minister for Planning approved Amendment C123 (PDF 453Kb). Notice of the approved amendment was advertised in the Government Gazette on the 15 October 2015 which is when the changes were formally introduced into the Moreland Planning Scheme.

The following amendment documents were approved by the Minister form Planning and now form part of the Moreland Planning Scheme as of 15 October 2015. 

Further information

Independent Panel Report

Expert Witness Reports for Planning Panels Victoria Hearing (July 2014)

Supporting documents 

The Coburg Initiative: Baseline Research

Pentridge Masterplans

There are documents on this page in PDF-only format. If you have trouble opening or viewing a PDF document, contact Council and we will arrange to provide the information in a format that suits your needs. See Council's accessibility page for further details.

There are documents on this page in PDF-only format. If you have trouble opening or viewing a PDF document, contact Council and we will arrange to provide the information in a format that suits your needs. See Council's accessibility page for further details.